Roof remove the release fi lm and install this half sheet at a right angle to the slope.
Tamko roofing installation instructions.
Surface proper ventilation is essential.
Overlap each metal piece by at least 150 mm 6 and use asphalt plastic cement under each section of overlap.
From the bottom edge of the shingles so that the shingles fit beneath the existing third course and align with the edge of the starter strip.
House photography throughout this website may have been digitally modified or created using photographs of actual shingles.
Prior to making your final color selection tamko recommends viewing an actual roof installation of the same shingle color and manufacturing plant you are considering for the full impact of color blending and patterns.
Remove release liner to adhere sa base.
If tamko sa base nailing is required by local codes see alternate.
When covering hips and valleys always overlap felt by.
Apply the underlayment parallel to the eaves starting with the.
Press shingle firmly into the adhesive.
Cut holes in the shingles to the correct size to fit over the roof and gable vents.
To insure immediate sealing apply 4 quarter sized dabs of tam pro premium sbs adhesive or tamko tam seal adhesive on the back of the shingle 1 25mm and 13 330mm in from each side and 1 25mm up from the bottom of the shingle.
Center a minimum 610 mm 24 wide minimum 28 gauge pre finished galvanized metal valley liner in the valley and fasten with only enough nails to hold it in place nailing at the edges only.
In these situations hand sealing of the shingles is recommended.
Nail down the shingles along the top of the roof for the ridge cap.
Cut off approximately 2 in.
Then install a full 39 3 8 wide sheet side lapped 2 and end lapped 4.
At tamko the popular heritage shingle series features the best roofing colors on the market that are backed by a brand name recognized for its rich history core values of honesty and integrity quality products and processes authority with building professionals and support for its community.
Be careful to offset the end laps a minimum of 18.
Cement tamko tam seal roof patch sealant or any adhesive meeting astm d4586 type i on the back of the shingle 1 and 13 in from each side and 1 up from the bottom of the shingle.
Lowest course lapping each course 2 5 1cm.
Join lap 4 10 2cm.
Long shingle and fasten according to the instructions printed in section 3.
For maximum wind resistance along rakes install any tamko.
Start the first course with a full 36 in.