Attach he ridge cap shingles with two nails each.
Step by step roof installation.
There are three systems including glue down torch.
Trim the shingles away from the ridge vent hole.
For a sturdy foundation roof mount flashings should be bolted to your roof rafters.
Don t worry if you don t own all of the tools needed to complete this diy project.
Eave trim also referred to as drip edge is the first piece of trim that will be installed on your metal roof.
Above the roof edge so you ll have something to hang on to as you step onto and off the roof.
If the plumbing vent is close to the peak of the roof lap the shingles over the peak of the roof.
Corrugated r panel pbr panel and western rib 7 2 panel.
The final step in the roof installation process is to conclude with hip and ridge shingle application.
Step by step roll roofing installation.
Attach the plastic ridge vent with 3 roofing nails.
Position the ridge cap shingles over the ridge vent.
Extend the top of the ladder at least 3 ft.
Set up scaffolding to install the drip edge and first few courses.
This guide will teach you about metal roof types and give you step by step instructions on how to install a metal roof.
If you re installing an off grid system or a grid tie system with a battery backup the last step of installation for your system will be to install a battery bank.
This step by step installation article specifically covers eave trim installation for an exposed fastener panel such as.
Never step on any of the ladder rungs above the roof.
Roll roofing is made from the same asphalt composition material as shingles and it s easier to install.